Commissioning of demand-controlled ventilation

We perform function control of VAV & CAV dampers as well as troubleshooting in the event of any faults, and propositional adjustment of all mechanical ventilation after VAV or CAV dampers.

Play Video
Play Video

Start-up of demand-controlled ventilation

Commissioning and function control of automatic controls must be carried out in new ventilation systems with demand-controlled ventilation. An average of 20% of all newly installed automation has some form of deficiency that needs to be addressed. "If you start up a new system where there are faults and deficiencies that are not detected, it will have major consequences, both for the user, but primarily financially, as it will be much more expensive, with troubleshooting and measures, after the system is put into use.

In addition, proportional adjustment of mechanical dampers, outside of electrical dampers (VAV and CAV), must be carried out.

checked-white

Functional control

We perform functional checks of all electrical VAV and CAV dampers.

checked-white

Troubleshooting

If errors are detected in systems, we conduct a thorough troubleshooting to find the solution to the problem.

checked-white

Propositional regulation

We use the propositional method when performing propositional control on all mechanical ventilation after VAV or CAV dampers.

How can we help you with Commissioning of demand-controlled ventilation

We want to be as helpful as possible. Get in touch with us and explain what you're looking for, and we'll find a solution for you!

This field is for validation purposes and should be left unchanged.